STEP 8 - STEEL CABLE PASSAGE 2
THE RIGHT POSITION OF THE CABLE
TENSIONEr ASSEMBLING (20), IS
INDICATED THRU THE FRIEZE PLACED
IN TIS EXTREMITY! (FRIEZE DOWN).
Load
Multiplier
Maximum
Distance
3,0 cm
Counter nut
Frieze
Maximum
distance
2,5 cm
Adjusting the steel cable in the
multiplier and the tensioner.
ID.
PART
Tensioner
20
22
Lock pin of the steel cable
Hex nut low profile
24
-
Steel cable 2 (Smaller)
FRIEZE
DESCRIPTION
QTY.
-
1
-
3
M08
1
-
3
Figure 8-1
24
20
Figure 8-3
24
20
Figure 8-5
2
25
ASSEMBLY
Figure 8-2
22
22
22
Figure 8-4