Descargar Imprimir esta página

Rubbermaid 5L45 Manual Del Usuario página 8

Publicidad

20
Lubricate roof snaps on front Gable (M) 8 places.
Raise the Left Roof Panel (N) onto the front left side of the
shed assembly, the arrows on the roof panels should face the inside of
the shed and point towards the Ridge Beam (R).
21
Using (2) step stools (1 inside shed, 1 outside shed), lift bottom of the roof panel above horizontal, guide the roof panel into the Ridge Beam (R), align the front Gable (M) rib
with the channel in Left Roof Panel (N), engage Left Roof Panel (N) in Ridge Beam (R) by lowering the bottom of the roof panel onto the shed assembly (hold Ridge Beam (R)
to prevent twisting). DO NOT SNAP ROOF DOWN.
1
N
R
N
R
R
M
2
N
R
Channel
Roof Panel
Gable Rib
Rib
3

Publicidad

loading