Control Of Any Coupled Boiler - klover PB 35 Instalación, Uso Y Mantenimiento, Consejos Útiles

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

If a "traditional" flue is used for discharging the flue gas, make sure that is in good working order and complies with the standards currently in force. If the
flue should be too big (internal diameter greater than 14 cm), duct the flue using an appropriately insulated stainless steel pipe (using rock wool
or vermiculite) and dimensioned on the basis of the route. The connection to the flue must be appropriately sealed.
When assembling the flue, directions must not exceed 4 changes, including the initial T-shaped fitting. The maximum length of the horizontal
tract allowed is of 2 metres. Before carrying out horizontal movements, carry out a vertical tract of at least 1.5 metres.
ELECTRICAL CONNECTION
The electric connection must only be performed by qualified staff, with respect to all general and local Safety Standards in force.
Check that the power supply voltage and frequency correspond to 220V – 50 Hz.
Appliance safety is obtained when it is correctly connected to an efficient earth plant.
In the electric connection to the mains power supply, envision a differential magnet circuit breaker switch at 6 A – Id 30 mA with relevant breaking load. The
electric connections, including the earth, must be made after the voltage has been removed from the electric plant.
When realising the system remember that the cables must be placed in an unmovable and away from parts subject to high temperatures. During the final
wiring of the circuit, only use components with a suitable electric protection rating.
KLOVER srl declines all responsibility for injury to persons, animals or damage to objects deriving from failure to con nect the boiler
to earth and failure to comply with IEC Standards.
The electronic control unit manages and controls all boiler functions always assuring excellent functioning of the entire appliance.

Control of any coupled boiler

If the Pellet Boiler is to be coupled with another boiler already installed in the system (e.g. wall -hung gas boiler), it must be ensured that when
the pellet boiler functions for the heating system, the boiler stops. This is so that the calories in the two appliances inst alled in the system to
not have to be added. This is why our set -up intervenes on the coupled boiler when the pellet boiler heating pump starts. In this way, there will
never be two boilers functioning simultaneously in the same system. The coupled boiler will al ways be able to be used for the production of
domestic hot water.
The two wires prepared on the back of the boiler (blue and brown wires), on outlet will have a voltage of 220 V when the pellet boiler pump
functions, no voltage when the pump is at a standstill.
Therefore, it is easy to connect the 2 wires to a relay that will control the Room Thermostat inlet of the coupled boiler.
ISPECTION
MAX 500 mm
BLUE WIRE
BROWN WIRE
O 100 mm
ISPECTION
Boiler room
thermostat inlet
8
O 120 mm
ISPECTION

Publicidad

Tabla de contenido
loading

Productos relacionados para klover PB 35

Tabla de contenido