#8-18 x 1- 1/2"
Panhead Screw
Adjustable In-line
Wall Jamb
#8-18 x 1-1/2"
Panhead Screw
1. Install the End Panel
Install the Adjustable In-line Wall Jamb and End Panel
Place the adjustable in-line wall jamb against the wall and level the wall jamb vertically.
Place the adjustable in-line wall jamb so that the transition jamb lines up with the edge of the knee
wall.
NOTE: Dry fit the installation prior to drilling holes for proper alignment.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
NOTE: When installing on ceramic tile, use a center punch to nick the surface of the glaze and mark the
hole locations. Tap the center punch lightly with a hammer to avoid cracking the tile. Use a tile or
masonry bit when drilling the holes.
Drill a 5/16" hole at each mark. Use a tile or masonry bit for ceramic tile.
Press and hold the legs of each anchor (provided) together and insert the anchor legs into the
pre-drilled mounting holes.
Repeat for all the anchors.
Thoroughly clean the shower floor, ledge, and wall.
Secure the wall jamb with #8-18 x 1-1/2" screws.
Slide the end panel into the adjustable in-line wall jamb.
Position the end panel and drill three 1/8" holes through the adjustable in-line wall jamb and end
panel frame.
Secure the end panel to the wall jamb with #8-18 x 3/8" screws.
Sterling
Ø 5/16" Hole
Anchor
Press and hold
legs together.
Anchor
#8-18 x 1-1/4"
Panhead Screw
#8-18 x 1-1/4"
Panhead
Screw
5
#8-18 x 3/8"
Panhead Screw
End Panel
Non-Adjustable
In-line Connector
Jamb
#8-18 x 3/8"
Panhead Screw
90˚
Transition
Jamb
1211021-2-A