Descargar Imprimir esta página

ABB ACQ580-31 Guía De Instalación Rápida página 15

Ocultar thumbs Ver también para ACQ580-31:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
G – Connect the control cables
Procedure:
1. Remove the front cover(s) if not already removed.
2. Frame R3: Lift the control panel holder up. See figure
3. Remove the rubber grommets from the bottom plate for the cable conduits to be
installed.
4. Attach the cable conduits to the bottom plate holes.
5. Strip the cable ends and cut to suitable length (note the extra length of the
grounding conductors).
6. Route the cables. Frame R3: See figure
Frame R6: See figure
on page 128.
7. Secure the cables inside the drive with cable ties.
8. Ground the pair-cable shields and grounding wire at the grounding terminal (SCR)
of the control unit.
9. Connect the conductors to the appropriate terminals of the control unit. See
Default IO connection diagram
10. Wire the optional modules if included in the delivery. See the option module user's
manual or installation guide.
Note:
• Leave the other ends of the control cable shields unconnected.
• Keep any signal wire pairs twisted as close to the terminals as possible.
H – Reinstall cover(s)
See figures
H (R3, R6, R8)...
...G (R3)...
...G (R6)...
on page 128. Frame R8: See figure
on page 16.
on page 129.
EN – US quick installation guide 15
G (R3)...
on page 127.
on page 127.
E
US
...G (R8)...
D
E
F
F
N
P
P
R
S
T
Z

Publicidad

loading

Este manual también es adecuado para:

Ach580-31