Pentair INTELLIBRITE 5G LIGHT Guía De Usuario página 17

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

REPLACING THE FUSE HARNESS ASSEMBLY (FOR 12 V LIGHTS ONLY)
connector plug from
circuit board terminals
Replaceable
fuse
harness
assembly
Fuse harness
(press down
to release)
Replaceable fuse harness assembly
1.
Using your fingers, carefully disconnect each fuse connector plug from the
circuit board terminals. Carefully lift each connector plug upward, with small
side-to-side movements while holding the circuit board terminals with a flat
screw driver. Then gradually disconnect the connector plug from the terminal.
Note: To avoid permanent damage to the circuit board, be sure not to pull the
terminals off the surface of the circuit board.
2.
Once the fuse connector plugs are removed from the circuit board terminals,
separate the fuse assembly from the light wire harness by pressing down on the
fuse release lever, then gently pull apart.
3.
Insert the new fuse harness connector into the light cable harness plug and snap
together.
4.
Using your fingers to carefully connect each fuse connector plug onto the circuit
board terminals. Be sure not to press down to hard on the connector, this can
damage the terminal connections on the circuit board.
5.
Continue with "
ASSEMBLY WITH NEW GASKET AND UNI-TENSION WIRE CLAMP"
on page 15.
Carefully remove
INSTALLING THE INTELLIBRITE
INTELLIBRITE
5G Pool and Spa Lights Installation and User's Guide
®
Circuit board
terminals
Light housing
with circuit
board
®
5G POOL LIGHT
13

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido