STEP 4:
ADJUST HEIGHT OF NEW FILL VALVE
A: TWIST FILL VALVE TO ADJUST HEIGHT
Top of fill valve cap should measure roughly 3"
above top of overflow pipe when installed.
NOTE:
Increasing height allows
more water to fill in the tank.
TWIST
LEFT
Fill Valve Cap
6
HOLD
Do Not Move Lock Ring
TOP OF FILL VALVE CAP
3"
TOP OF OVERFLOW PIPE
Hint: Use the
Green Toilet Tool
to measure.
STEP 5: INSTALL NEW FILL VALVE
A: INSERT FILL VALVE
Position refill tube to face flush
valve making sure fill valve parts
do not interfere with lever arm.
HINT: See next page for full tank setup.
B: INSTALL LOCKNUT
Using
Green Toilet Tool
locknut onto fill valve shank (below
tank). Tighten 1/4" beyond hand-
tight. Do Not Overtighten*.
Green Toilet Tool
™
C: PUSH REFILL TUBE
ONTO REFILL PORT
D: CONNECTING REFILL TUBE
TO FLUSH VALVE
™
FOR KOHLER
AQUAPISTON:
®
Push refill tube onto yellow nipple on flush valve.
™
, screw
7