Emerson ASHLAND CF717AP02 El Manual Del Propietario página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installing Hanger Ball/Downrod Assembly
3.3
Securely tighten the Two Set Screws into the Motor
Coupler until they rest against the Downrod.
Pull up on the Downrod to make sure the Set Screws
are firmly installed against the Downrod (Figure 3).
NOTE: The setscrew must be properly installed as
described above, or fan wobble could result.
WARNING
!
It is critical that the clevis pin in the motor coupler
is properly installed and the setscrews securely
tightened. Failure to verify that the pin and setscrews
are properly installed could result in the fan falling.
3.4
Make sure the Grommet is properly installed in the
Motor Coupler Cover then slide the Motor Coupler
Cover on the Downrod until it rests on the Motor
Housing. Be sure the Motor Coupler Cover is oriented
correctly (Figure 4).
3.5
Pass the 80-inch long Motor Wires through the opening
in the Ceiling Cover.
Place the Ceiling Cover over the Downrod. Be sure the
Ceiling Cover is oriented correctly (Figure 5).
(For Standard Mounting) (Continued)
MOTOR
COUPLER
Figure 3
Figure 4
Figure 5
6
DOWNROD
SET SCREWS (2)
DOWNROD
GROMMET
COUPLER COVER
MOTOR
HOUSING
CEILING
COVER
DOWNROD
ETL Model No.: CF717-2

Publicidad

Tabla de contenido
loading

Tabla de contenido