Lista di controllo per la messa in funzione
Serial number of the system:
Name of the customer:
Name of the installation company:
1
Check the positioning of the system
1.1
Does the system face south in the Northern Hemisphere and north in the Southern Hemisphere?
1.2
1.3
Has the system been installed at an installation angle of 5°–45°?
1.4
Has the system been installed at a minimum distance of 1 m from the walls or the edge of the roof?
2
Check the installation of the system
Was the provided manual used?
2.1
Is the operating pressure below 10 bar?
2.2
2.3
Are the ventilation openings free and/or not closed?
2.4
2.5
2.6
If the cold water pressure in the main line exceeds 10 bar:
2.7
Has a pressure reducer been installed?
2.8
To avoid problems with moisture or water ingress on the roof, the pipes leading into the roof must be
particularly well-sealed. The construction engineer on site should give you precise instructions that are
2.9
tailored to the type of roof construction.
All connecting pipes must be very well-insulated to protect against frost and damage by UV radiation.
2.10
Has an insulating material been used that corresponds to the local weather conditions?
2.11
2.12
2.13
Has the system been checked for leaks?
The system can produce hot water with temperatures above 60 °C.
2.14
Has the recommended mixing valve been used?