TOYAMA TE700 Manual Del Propietário página 10

Motocultivador gasolina
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

part of mud fender place is as the picture. Then install side mud fender
on both sides and screw up small handles.
 Handle bar installation: assemble handle bar components on tiller. The
handle bar frame position is symmetrical accordingly for the tiller, then
use the locked pin to fix the frame.
Installation and adjustment of cables
Adjustment of clutch cable(Look at picture 1 and picture 2)
 - Unlock nuts on the screw rod.
 - Instantaneously rotate the screw rod to show the shortest part of the handle bar.
 - Connect the clutch cable head into clutch plug behind the gear box assy, thread
the cable into axis pin M6×20, and fix with jump ring.
 - Properly pull down the clutch cable and fix the clutch cable head to handle bar
bottom.
 - Rotate out the screw rod and clip it repeatedly, unlock the clutch handlebar
until spring force of clutch can reset the bar, finally fasten the nuts.
Throttle
cable
Clutch cable
Lock nut
Handlebar
lock
Picture 1
Throttle
switch
Shut down
switch
Clutch
handlebar
10

Publicidad

Tabla de contenido
loading

Tabla de contenido