Operator Instructions; Operator Control Panel; Converter Set Up - Ranpak FillPak TTC Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 83
FillPak
TT with Cut Mechanism
®

3. OPERATOR INSTRUCTIONS

EN
Before operating the converter, the
information from
be read and understood.
Warning!
3.1

Operator control panel

1.
2.
3.
4.
Power lamp – see Section 5.3 for function
Error lamp – see Section 5.3 for function
Reset button – This button is used to acknowledge
operation error (red light)
3
Section
"Safety" must
Main
Supply
to
the
converter
Power Button
-
Set the main switch to
"On"
Power/Main Switch
Indicator Light
-
Converter is ready for
use
Fuse
Accessory Ports
includes:
-
2 Foot Switches
EDS mode switch – see Section 3.5 for function
EDS mode pad length control – see Section 3.5 for
function
3.2

Converter set up

Follow the assembly instructions supplied with the
converter and check that the following conditions are met:
Section "Safety" of this manual has been read and
understood
The electrical connection from the cutter head is
connected to the power supply
The electrical connection from the feed motor is
connected to the cutter head
The foot switch is plugged in
All covers are secured
Hands are free from the converter inlet/outlet
The two safety pins on the stand are in place
Then follow these steps:
-
Plug the power plug into the wall socket (if applicable)
-
Set the main switch to "ON" or "I"
A lamp will light up on the operator main switch
The green lamp will light up on the cutter head
The converter is now ready for use.
FillPak
TT with Cut Mechanism Operator Manual - EN
®

Publicidad

Tabla de contenido
loading

Productos relacionados para Ranpak FillPak TTC

Tabla de contenido