Right Or Rear; Cut Out Ductwork Opening In Cabinet - Bosch HDD80050UC Instrucciones De Instalación

Ocultar thumbs Ver también para HDD80050UC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
C - Installation using inline or remote
blowers - with ducting through left,

right or rear

(Requires purchase of 1-7/8" x 19" (48mm x 483mm) to 6" or
8" (152mm or 203mm) round transition. 1-7/8" x 19" (48mm x
483mm) rectangular duct and connection adapters are also
available.)
1. Remove only one RECTANGULAR DISCHARGE COVER.
DUCTING OUT RIGHT SIDE OF
HOUSING SHOWN.
2. Use nuts to connect 1-7/8" x 19" (48mm x 483mm)
rectangular ductwork connection adapter or 1-7/8" x 19"
(48mm x 483mm) to 6" or 8" (152mm or 203mm) round
transition to housing when installing ductwork.
English 16
RECTANGULAR
DISCHARGE COVERS
This
Front Panel
remains
in place.

Cut out ductwork opening in cabinet

1. Measure and mark where to cut the ductwork opening
in the cabinet based on the ducting option selected.
Use the dimensions in the illustration below to help plan
how and where to provide duct access through your
cabinet.
Hole in Cabinet Floor
Dimension A
Using Flex Blower (Model DHG602DUC) &
8" (203mm) round duct straight
down through cabinet fl oor.
(1½" /38mm left of installation center line)
7¾ inches (197mm)
2. Set downdraft into cabinet/countertop opening as far back
as possible and make sure it is level.
Measurements
in inches (mm).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hdd86050uc

Tabla de contenido