Outside Mount - Levolor Sheer Shadings Instalación

Ocultar thumbs Ver también para Sheer Shadings:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
Drill the screw holes using a
/
" drill bit.
3
32
IMPORTANT: Use drywall anchors when mounting into drywall.
Use a level to check that the mounting surface is level.
Shim the brackets, if necessary.
Attach the installation brackets using the screws provided.
IMPORTANT: Do not overtighten the screws. Check to ensure
the lever can be moved easily side to side. If not, loosen the screws in one-eighth
turn increments until the lever can be moved easily.
IMPORTANT: The front edges of the installation
brackets must be level and aligned to each other.
If using spacer blocks:
— Stack spacer block(s) on top of the installation brackets,
— Using #6 Hex Head Screws, long enough for secure installation (not provided),
install screws up through the underside of the installation bracket and spacer
block(s) into mounting surface.
IMPORTANT: Do not add more than 1
Proceed to "Install the Shading" on page 11.

OUTSIDE MOUNT

Mount the Installation Brackets
Center the headrail over the window opening at the desired height. Use a pencil to
lightly mark each end of the headrail.
— Alternatively, measure the width of the headrail and use that width to mark the
headrail end points over the window opening.
Mark 2" to 3" from each end of the headrail.
— If more than two installation brackets came with your order, space additional
bracket(s) evenly between the two end brackets and mark their location. Mount
into wood whenever possible.
Center the installation brackets or extension brackets on your marks and mark
where to drill the screw holes.
— A minimum 1
" flat vertical surface is required for the installation brackets.
1
8
Extension brackets require 1
1
Single Headrail Shadings.
2" to 3"
Space Evenly
Headrail End Mark
8
Continuous Cord Loop Operating System
20-0034-033_Sheer_Shadings_Cont_Cordloop_F_010621.indd 8-9
1
/
in. of clearance using the spacer blocks.
2
".
4
Space Evenly
2" to 3"
Window Opening
Headrail End Mark
Lever
NOTE: Two additional installation brackets should be placed on each side of the panel split.
2" to 3"
Headrail End Mark
Spacer
Blocks 1
"
1
— The tops of the installation brackets or extension brackets should be at the
2
Maximum
desired height. The brackets should be level and aligned.
IMPORTANT: The rear of the brackets must be flush against a flat mounting
surface. Do NOT mount brackets on curved molding.
1
/
"
1
8
Drill the screw holes using a
IMPORTANT: Use drywall anchors when mounting into drywall.
Attach the installation or extension brackets using the screws provided.
IMPORTANT: The tops of the installation brackets or extension
brackets must be level with their front edges aligned.
Two-On-One Headrail Shadings.
Panel Split
Space Evenly
3"
3"
Space Evenly
Window Opening
1
1
/
"
4
3
/
" drill bit.
32
Continuous Cord Loop Operating System
INSTALLATION
2" to 3"
Headrail End Mark
Extension
Bracket
9
1/6/21 4:47 PM

Publicidad

Tabla de contenido
loading

Tabla de contenido