3. Before you really start ...
Unpacking
– Remove the packaging.
The scope of supply includes:
seca 242
• measuring rod, bottom part
• measuring rod, top part, with head stop
• heel plate
• display unit
• desk-top stand
• wall bracket
• 5 mounting screws
• 5 rawlplugs
• 20 spacers
• 2 cylindrical bolts (plastic) and nuts
• 1 bag containing a pan-head tapping
screw
• 10 AA 1.5 V batteries
• 1 instruction manual
seca 245
• measuring rod, bottom part, pre-
mounted to column
• measuring rod, top part, with head stop
• statometer platform
• display unit
• desk-top stand
• wall bracket
• 2 mounting screws
• 1 bag containing a pan-head tapping
screw
• 10 AA 1.5 V batteries
• 1 instruction manual
16