Chapin 82125 Operación Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 6:
Look inside hopper. Insert
R-pin into hole in impeller
shaft.
Step7:
A portion of the Handle will be preassembled as shown. Carefully remove the
(2) M6 Hex Nuts, while holding the rest of the Handle Assembly together.
Install opposite Handle onto the
exposed (2) M6 Hex Bolts, and re-
secure the (2) M6 Hex Nuts.
Step 8:
Assemble Handle Tube to Frame Legs by sliding
Handle Tube into the gap between the two parts
and using (2) M6X55mm bolts and (2) M6
Nylon Locknuts to connect the parts together.
Handle orientation is important (see image).
Finish tightening frame legs to the frame body.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

8210082080

Tabla de contenido