Gree D Serie Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

(3) Enough space shall be left for service and ventilation. Be sure there is at least 2m between the
equipment and any barrier and it is better to set up a sun cover 3m ahead of the equipment.
(4) The unit shall be installed where it will not be affected by fire, corrosive, inflammable or
waste gas, and proper measures shall be taken to minimize the vibration and noise.
(5) The unit shall be installed where the defrosting water can be drained out favorably.
(6) Do not install the unit where there is heavy snow. If inevitable, build a foundation at least
300mm higher than the ground.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
D Series Modular Air-cooled Scroll Chillers Owner's Manual
6
(Unit:mm)

Publicidad

Tabla de contenido
loading

Tabla de contenido