EN
NEX S
4
Installation
4.1
Delivery check
If there are any damaged or missing parts when the product is delivered,
notify the carrier and the local Nederman representative immediately.
4.2
Mounting NEX S
See Figures 4–8. The extractor arm can be mounted on a wall. Ensure that the
wall surface is level, and use the wall bracket to mark the holes.
Use locking fixing bolts and nuts suitable for the wall material. The
bolts must each stand a minimum torque force of: 1100 N (NEX S 2 m),
2400 N (NEX S 3 m), 4000 N (NEX S 4 m).
Use a spirit level and make sure that the extraction arm is fitted in a horizontal
position.
NOTE! Make sure the NEX S housing is properly grounded. See figure 8 and
section 4.3 Earth control measurement.
NOTE! Fill out the installation protocol when finished installing the NEX S.
4.3
Earth control measurement
Check for proper earth connection, after both main installation and regular
maintenance. This is done by measuring as illustrated in Figure 8 item 10.
5
Operation
WARNING!
•
Do not collect material that is caustic, explosive, highly flammable,
chemically unstable, spontaneously ignitable, or which can release sparks.
•
Check that no objects which can cause sparking or fire are sucked in to the
arm, or impact against the hood.
•
Avoid mixing dust from different processes, for example service works and
plastic grinding mixed with metal grinding.
WARNING!
Squeeze risk. See figure 4.
CAUTION!
Avoid impact against the hood.
See Figure 9. The extractor arm can easily be positioned at any point within
its working area. It can be rotated 180° when wall mounted and 360° when
ceiling mounted. For best capture the hood should be positioned as near the
fume or dust generating process as possible.
Recommended air flow (Also, check local directions):
•
Maximum 1100 m
•
Maximum 1700 m
14
Ignition risk for some dust or solvents.
Risk of personal injury.
Risk of equipment damage.
/h (650 cfm) for hose Ø 125 mm.
3
/h (1000 cfm) for hose Ø 160 mm.
3