EN-2
2. INSTALLATION
Package Contents
Moisture Analyzer
Draft Shield
In-Use Cover
Pan Support
Power Cable
Selecting the Location
Operate the Analyzer on a firm, level surface.
Select a location that is safe and with adequate ventilation. Fire, corrosive or toxic fumes and other hazards associated
with the test samples will require specially prepared locations.
Ensure that the location has easy access to the local AC power supply.
Avoid locations with rapid temperature changes, excessive humidity, air currents, vibrations, electromagnetic fields,
heat or direct sunlight.
Installing Components
(1) Install and position Draft Shield
Connecting Power
Power: On (short press) / Off / Standby Mode (long press)
When powered on from standby mode, the Analyzer is ready for immediate use.
See also Section 1, Safety Precautions.
After connecting the Analyzer to the AC supply (standby mode), allow the Analyzer to warm up for at
least 15 minutes for best results.
50 Sample Pans
Glass Fiber Pad
Instruction Manual
Sample Pan Handler (MB25 only)
(2) Install Pan Support, turn until it
engages into position
Verify that the input voltage printed on the voltage identification label information
and the plug type matches the locations AC power supply.
Connect the supplied power cable to the power input receptacle at the rear of the
Analyzer and into a properly grounded power outlet.
MB23 / MB25
Optional Sample Pan Handler - Slide an
empty sample pan under the pan
handler, then place over the pan
support.