Schüco IPE 2700 SN 05 Manual Del Usuario página 46

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 53
Commissioning
Commissioning master
42
1.
The commissioning process starts with setting of the display language. Select
the language in selection menu with
Confirm the selected language with
2.
Select the country in the selection menu with
3.
Confirm the country of installation with
NOTE
The inverter only starts feeding current into the grid once the country has been se-
lected.
4.
Select "Master" in the selection menu with
Confirm with
.
NOTE
The other units in the CAN network are automatically configured as slaves.
5.
Set the date and time centrally for all connected units.
Select the time with
to the next number with
Apply the set time with
Apply the set date with
NOTE
Please note that time settings should only be made with caution, as they directly af-
fect data logging. For example, if you set the time back by 1 hour, then the existing
data will be overwritten.
6.
Automatic or manual device search
The IDs for the slaves can be allocated automatically or manually.
/
.
.
.
/
. Change the selected number with
/
.
and set the date accordingly.
.
/
.
.
/
and jump
IPE 2700 - 5000 SN 05

Publicidad

Tabla de contenido
loading

Productos relacionados para Schüco IPE 2700 SN 05

Este manual también es adecuado para:

Ipe 3000 sn 05Ipe 3600 sn 05Ipe 4500 sn 05Ipe 5000 sn 05

Tabla de contenido