Installation and Operation Manual
X-VAP-DLI-Standard-eng
Part Number: 541B203AAG
May, 2016
2-1 General
2-2 Receipt of Equipment
This section provides installation instructions for the Brooks DLI Vaporizer.
The installation of the DLI vaporizer involves mounting the device, making
the required mechanical connections and making the required electrical
connections
When the instrument is received, the outside packing case should be
checked for damage incurred during shipment. If the packing case is
damaged, the local carrier should be notified at once regarding their
liability. A report should be submitted to your nearest Product Service
Department.
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554 FLOW (3569)
Tel (215) 362 3700
Fax (215) 362 3745
E-mail: BrooksAm@BrooksInstrument.com
www.BrooksInstrument.com
Europe
Brooks Instrument GmbH
Zur Wetterwarte 50 Haus 377/B,
01109 Dresden
Germany
Tel +49 (0) 351 215 20 442
In case you need technical assistance:
USA 888 275 8946
Europe +49 351 215 2040
Japan +81 3 5633 7100
Korea +82 31 708 2521
Remove the envelope containing the packing list. Unpack and inspect the
DLI vaporizer and additional items for any possible shipping damage. The
DLI vaporizer is shipped with the Installation & Operations Manual. Any
outlet orifice will be taped to the side of the vaporizer enclosure. Do not
discard/lose this orifice as the vaporizer may not operate correctly without it.
Contact Brooks if there are any problems or if more information is required.
Section 2 Installation
®
Brooks
DLI Vaporizer System
Asia
Brooks Instrument Korea, Ltd.
D-406 Bundang Techno Park 151
Sungnam, Kyungki-do, 463-070
Korea
Tel +82 31 708 2522
Taiwan +886 3 5590 988
China +86 21 5079 8828
Singapore +6297 9741
2-1