Installation And Start-Up; Prior To Installation; Installation - Gaggia Ruby Manual De Instrucciones

Ocultar thumbs Ver también para Ruby:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
4.

Installation and Start-Up

4.1 Prior to Installation

 Models with connection to mains water supply
This equipment shall be installed in accordance
i
with local plumbing codes
Models with vibrating pump include as an
accessory a pressure reducer and a pressure
gauge to adjust the network pressure to 1 bar.
Verify before Installing:
1. Drainage tube with an interior diameter no less
than 35 mm.
2. Mains water network supply tube connected to
water softener.
3. Stopcock with 3/8" G exit.
4. Grounded plug protected with a magneto-
thermic circuit breaker.
5. Water supply tube (supplied with machine)
from water softener.
6. Drain tube
7. Water softener
Models with internal Water Tank
Verify before Installing:
1. Grounded plug protected with a magneto-thermic
circuit breaker

4.2 Installation

Once the machine has been unpacked, the following steps should be performed:
Check that the electricity supply voltage is the same as that listed on the specification plate and in the machine's
documentation.
20
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ruby pro

Tabla de contenido