Lutron Electronics Energi Savr Node QS DALI Manual De Instrucciones página 8

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 13
Energi Savr Node
Step 5: QS link wiring (continued)
Only terminals 1, 3, and 4 connected
between devices that supply PDUs
COM
MUX
MUX
Terminal 2 NEVER connected
between devices that supply PDUs
Devices that
supply PDUs
Terminal 2 (+24 V)
NEVER connected
1
Terminal 2 (+24 V)
NEVER connected
1
Terminal 2 (+24 V)
NEVER connected
1
Wiring Rules
1. Terminal 2 (+24 V) should NEVER be connected between devices that supply PDUs.
2. For QS link power supply wiring connection details, refer to the installation
instructions for the specific power supply model being used.
Lutron
8
|
®
|
QS DALI
TM
All 4 terminals connected to QS link
devices that consume PDUs
Devices that
consume PDUs
QS Link;
all 4 terminals
Energi Savr
Node QS unit
QS Link;
all 4 terminals
Energi Savr
Node QS unit
2
QS Link;
all 4 terminals
QS
Link
power
supply
Installation Guide
COM
+24 V
MUX
MUX
Wired QS
Wired QS
Wallsta-
Wallsta-
tion
tion
Wired QS
QSM
Wallsta-
tion
QS
Wired QS
Input/
Wallsta-
Output
tion
Interface
Energi Savr Node
Wired QS
Wallsta-
tion
QSM
Wired QS
Wallsta-
tion
QS DALI Installation Guide
TM

Publicidad

Tabla de contenido
loading

Productos relacionados para Lutron Electronics Energi Savr Node QS DALI

Tabla de contenido