Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
GROUND
8- Fit the deceleration and opening and closing limit switch enable magnets in the desired position. In any case,
always refer to the control unit instructions for handling the limit switches.
There are several seats on the limit switches in which to position the magnets spaced out 5°, which is equivalent to
a circumference arc of 250/300 mm on a 2.5 m long leaf.
If using two magnets (deceleration enable and end of motion), it is recommended to always leave at least one seat
empty between the two magnets.
9- If the sensor fails to read, appropriately adjust its height e(21) by loosening the retaining screws f(18) and
screwing or unscrewing the cheese-headed screws e(18). When done, tighten the retaining screws.
NOTE ON MAGNET FITTING DIRECTION
When fitting the magnets d(20), pay attention to their polarity: on each single holder fit the magnets facing the same
polarization direction.
To check exact fitting, the operator must be connected to the control unit. Activate the operator until the magnets pass
over the sensor c(17); check on the control unit that the LEDs relative to the opening and closing limit switch inputs go
off and that the operator stops in the gate-open and gate-closed positions.
Invert the magnets if the phases are not as desired.
It is recommended to use an electric lock for leafs larger than 2,5 m and in any case for blind or flush panel
doors.
START-UP
- Program the circuit board as required following the relative instructions.
- Power the operator and check the LED status as indicated in the table in the instructions for the electronic part.
TESTING THE AUTOMATED DEVICE
Carefully test the automated device as well as all the accessories connected to it.
Give the customer the instructions for use and demonstrate proper functioning and use of the device, the safety
devices, cautions and warnings.

MANUAL OPERATION

Should it be necessary to manually operate the gate, use the manual key unlocking device.
N.B.: The unlocking operations must be carried out only in the case of an emergency and especially with the power
DISCONNECTED.
The manual unlocking device is situated on the support bracket of the gate and allows unlocking the gate both from
the inside and the outside of the property.
To manually open the gate, operate as follows:
- Uncover the lock sliding off the protective cap as shown in (22).
- Insert the unlocking key in the lock (22) and turn it.
- Pull the lever towards you and manually move the leaf.
RESTORING NORMAL OPERATION
To restore normal operation, act as follows:
- Return the lever/s to its/their normal position, i.e. to the back of the bracket (23).
- Insert the unlocking key in the lock and turn it.
- Manually move the leaf until the lock couples on the locking bracket.
- Close the protective lock sliding cap.
21
UK

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ground 624

Tabla de contenido