Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
22
UK
FITTING THE ELECTRIC LOCK (24-25)
It is recommended to use an electric lock for leafs larger than 2,5 m and in any case for blind or flush panel doors.
1- ELECTRIC LOCK
2- ELECTRIC LOCK FASTENING PLATE
3- LATCH COUPLING
4- END-STOP FOR LATCH COUPLING
5- LATCH
6- THROUGH CYLINDER (ON REQUEST)
7- GATE

FINAL TESTING

Power the system and run a complete opening and closing cycle checking that:
• The safety devices function properly
• The gate moves smoothly
• The solidity of the foundation plate
• The gate assembly conforms to EN 12453 and EN 12445.
• For further details and information on the reference standards, visit our site: www.gibidi.com
MAINTENANCE
Periodically check the gate paying particular attention to:
• Check the hinge pivots
• Check good functioning of the safety devices.
• Unlock the operator and check that there are no points of friction along the entire travel of the gate.
• Check that there is no dirt or deposits on the transmission levers.
Periodically check proper adjustment of the electronic anti-crushing safety device and the efficiency of the unlocking
device for manual operation (see the relevant paragraph). The safety devices installed on the system must be
checked every six months. Gi.Bi.Di. Srl reserves the right to change the technical data without prior notice in relation
to product development.
MALFUNCTIONING
For any unresolved malfunction, cut the power to the system and call in a qualified technician (installer). In the period
when the gate is out of service, activate the manual unlocking device to allow manual opening and closing.
GROUND

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ground 624

Tabla de contenido