2.2.10 Discharge valve installation
Note: Please open the valve (14) before install it in case of damage the vessel body.
1)RE‐610 discharge valve (14) installation
Put 80# flange mouth screw (59) and 80# flange mouth retainer ring (60) on the flange mouth of vessel body (9) and
discharge valve (14), put 80# flange mouth sealing ring (61) on the flange mouth of discharge valve (14), position it in
place, tighten the butterfly nut.
2.2.11
Vacuum gauge and control box installation
Please see chapter 1.4 to find the installation position of Vacuum gauge (4) and control box (17).
2.2.12
Vessel jacket circulating pipe kit installation
The lower connecting joint of the vessel jacket is inlet, the upper is outlet. Please refer to figure 2.2.10.2 to install it.
46
Figure 2.2.10.1 RE‐610 discharge valve installation
Figure
2.2.12
9 Vessel
14 Discharge valve
59 80# flange
60 80# flange mouth retainer ring
61 80# flange mouth sealing ring
62 Joint
63 DN15 high temperature ball valve
64 Square three‐cavities
65 U shape fixing frame
66 Gasket
67 Stainless steel hose
68 Elbow
Circulating pipe kit installation