2.2.6 Condensing dispenser and condenser installation
RE‐610 Condensing dispenser and condenser installation
Place the tray (44) on the frame, put the condensing dispenser (18) on the tray (44). Connect the condensing dispenser
(18) and the reactor lid joint, adjust the position of tray (44), tighten the fixing screw (45) and fixing nut (48). Put the
condenser (19) on the upper joint of the condensing dispenser (18), the rubber bracket (43) is locked around the upper
portion of the condenser (19), please see figure 2.2.6.2.
6 Reactor lid
18 Condensing dispenser
19 Condenser
20 Nozzle
43 Rubber bracket
44 Tray
45 Lock screw
46 Screw retainer
47 Screw retainer ring
48 Fixing nut
2.2.7 Sensor installation
Put the fixing screw (49), fixing cover (50), O‐ring (51) and fixing base (70) on the sensor in turn, adjust sensor (22)
position, tighten fixing nut (49).
44
Figure 2.2.6.2 RE‐610 Condensing unit installation
Figure 2.2.7 Sensor installation
6 Reactor lid
22 Sensor
49 Fixing nut
50 Fixing Cover
51 O‐ring
70 Fixing base