Maintenance And Management; Management; Cleaning; Maintenance - J.P. SELECTA RE-610 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Maintenance and Management 
Ensure  to  make  the  equipment  running  normally  to  increase  its  service  life,  users  should  do  daily  maintenance  and 
management. Before maintenance, please disconnect equipment power supply, preparing tools, materials according to 
according to the specific requirements in the operation manual. Otherwise, it will cause electric shock or damage. 
5.1   Management 
Please follow following recommendations to keep the normal operation of the reactor:
1)
Check the ambient temperature and humidity regularly to ensure a better working conditions. 
2)
Avoid severe vibration when moving it.   
3)
Beware of touch the vessel in case of broke glass parts. 
If found the component aging or damage, please replace it timely according to the original specifications. 
5.2   Cleaning 
1)
Before cleaning the unit, disconnect the power cord. Otherwise, it may cause electric shock or fire hazard. 
2)
Use soft cloth to clean the surface. 
3)
Cleaning of glass parts should be done according to laboratory regulations. 
4)
Beware of hazardous substance leaks on the surface of the vessel or enters it. 
5)
Do not use brushes, grinding powder, acid, petrol or other solvents to clean the surface of the body to avoid 
damage to the protective layer. 
6)
If  the  vessel  and  its  connection  glass  parts'  temperature  is  high,  please  disconnect  the  power  until  it  is  fully 
cooled. 
7)
In order to avoid damage of components, please do not press the monitor and knob forcedly when cleaning them. 
5.3 Maintenance 
The  warranty  of  the  equipment  against  manufacturing  problems  is  of  12  months  from  the  date  of  purchase.  If  the 
equipment has been used improperly, compensation for the damage caused will be charged. 
 
Contact the Technical Service before obtaining professional maintenance to return the equipment to the factory: 
 
1. Clean the machine so as not to damage the maintenance personnel. 
 
2. Provide the description of the equipment failure. 
 
3. Pack the machine properly to avoid damage during transport. 
 
53

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1001722

Tabla de contenido