3-1-9 –Safety guard rails assembly
1. Remove the temporary safety guard rails and:
2. Hook the guard rail onto the:
a. Rung n°12 (3.00m configuration)
b. Rung n°10 (4.50m configuration – 1
c. Rung n°17 (4.50m configuration – 2
3. Deploy the "guard rail lifting pole".
4. Position the other end on the rung at the same level of the opposite ladder.
5. Push the guard rail into its final position.
6. Lock the anti-lift device.
2
3
5
106-A000035744 - ind.0 – 11/2021
st
guard rail)
nd
guard rail)
4
6
45