Menu item 9: Start-up menu
Menu item 10: Operating menu
Menu item 11: Service
*
Flamco will not accept any liability for the consequences of incorrect parameterisation.
It may sometimes be necessary to first edit a pressure value other than the intended one so that the actual value to be
changed receives enough space so that no implausibilities arise that could prevent system operation.
18
Read the instruction manual 9-1:.
Degassing modes 9-4:
Control type 9-5:
Pressure settings 9-6:
START 9-7:
Order number 11-1
System info 11-2:
Version information 11-3:
Commissioning 11-4:
Maintenance 11-5:
11-5-1 Due date or comment about
the performed maintenance 1
11-5-2 Due date or comment about
the performed maintenance 2
11-5-3 Reset treatment
History 11-6:
Operating times 11-7:
Top-up 11-8:
Only available as long as it has not yet been fully processed, for example, after
initial commissioning or resetting the Start menu in the "Configuration".
→ Read and acknowledge.
→ Choose between fully automatic and standby.
→ pressure-controlled, externally-controlled or top-up OFF
see also Top-up section.
→ Edit pressures in the diagram.
→ Trigger system START; jump to operating display 1.
(The commissioning time is also logged.)
3 screens - see Appendix 3 - Menu structure overview.
Menu item for reading information about the control unit and the operation already
performed and faults.
→ Order number / Date / Time / Input code level.
→ 11-2-1 System ID / type
→ 11-2-2 Degassing mode
→ 11-2-3 Control type
→ 11-3-1 Control unit software / hardware
→ 11-3-2 Terminal software / hardware
→ 11-3-3 Database
→ 11-3-4 Bootloader
→ 11-3-5 Language file
→ 11-3-6 Version of any modules fitted in SLOT 1
→ 11-3-7 Version of any modules fitted in SLOT 2
Date commissioning / time / code level during commissioning.
Recurring device test (1 year).
Recurring electrical test (1.5 years).
Reset processing capacity date / time / code level.
→ Fault code / Fault / Date / Time of occurrence (up to 100 faults can be
traced).
→ Motor pump / motor ball valve / pressure switch / degassing total since
commissioning.
→ Top-up amount / top-up time / top-up list / processing.