OVE GRANADA 60 Manual Del Usuario página 12

Porte de bain
Ocultar thumbs Ver también para GRANADA 60:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ROLLING TRACKS INSTALLATION
Note: These are important steps, carefully follow the instructions.
1. Slide the glass panel rolling track (J) into the top track (G), and push it to the end of the rail.
2. Slide the door rolling track (I) into the top track (G).
3-4. Do not fully insert the track (I): Leave a 15mm (19/32in) gap between the entrance of the top track (G) and
the end of the track (I).
5. Keep the door rolling track (I) steady. Gently push the glass panel rolling track (J) back toward the track (I),
until you feel both tracks gears are slightly engaged.
6. Slide the door rolling track (I) and the glass panel rolling track (J) together into the top track (G). They should
now be paired.
5
I
1
J
G
3
I
I
J
2
I
4
I
15mm
19/32 in
J
J
I
12
G
6
I
J

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

667452

Tabla de contenido