Note: 2 people are required for the following installation steps!
1-2.Install the glass panel (C) on the rolling track (J) using glass brackets (EE) and caps (OO). Adjust the level
of the glass panel using the eccentric mechanism of the brackets.
3-4. Install the bottom rolling track (L) on the bottom metal track (N) using bracket (FF) and cap (GG).
5. Insert the vertical rubber strip (O) to the track (F).
1
J
C
2
EE
3
N
L
4
FF
DOOR INSTALLATION
Helpful Hint
The center panel has an
up & down direction: make
sure the side with OVAL
holes is UP!
OO
GG
16
5
F
O