Descargar Imprimir esta página

Click Medical RF-200-07-01 Guia De Inicio Rapido página 3

Ocultar thumbs Ver también para RF-200-07-01:

Publicidad

Lock Pin
Contenido del kit de laminación RevoFit®:
Carrete Tecleo®
Tubo de laminación de 1,5 m
Alimentador de encaje
Collar de laminación
Cordón indicador de 2,0 m
Herramienta de bobina
Pasador de bloqueo
Fabrication Overview:
1. Determine adjustable design type: Panel, Gap, Hinge.
2. Determine areas of adjustment and location of Click® Reel.
3. Pull flexible insert material over mold.
4. Apply inner layers and complete 1st lamination.
5. Mark areas of adjustment and location of Click® Reel on device.
6. Glue RevoFit® components to device.
7. Apply outer layers and complete 2nd lamination.
8. Cut trim lines and areas of adjustment.
9. Sand and finish edges.
10. Apply pad material (if making panels).
11. Lace device.
12. Install Click® Reel and test for function.
13. Deliver to patient and optimize fit.
For material suggestions and guidelines, please refer to the Material Data Sheets located (insert link).
Visión general de la fabricación:
1.
Determinar el tipo de diseño ajustable: Panel, Brecha, Bisagra.
2.
Determinar las áreas de ajuste y la ubicación del carrete Click®.
3.
Tire del material de inserción flexible sobre el molde.
4.
Aplique las capas interiores y complete la primera laminación.
5.
Marque las áreas de ajuste y la ubicación del carrete Click® en el dispositivo.
6.
Pegue los componentes RevoFit® al dispositivo.
7.
Aplique las capas exteriores y complete la segunda laminación.
8.
Cortar las líneas de corte y las zonas de ajuste.
9.
Lijar y terminar los bordes.

Publicidad

loading