All manuals and user guides at all-guides.com
Operator's Manual
Optic System Verification includes two stages. The first stage ensures that the optical path is clear and
free of obstruction. The second stage confirms that the optics system is transmitting and detecting
emitted light particles properly. Transmission and detection verification requires the use of the illumipro-
10 Red Verification Standard. The illumipro-10 steps through the Verification protocol and prompts the
user for action as necessary.
The Red Verification Standard must be seated firmly in the Heat Block wells. The Verification Standard
should be oriented with the asset number tag at the Well 1 position.
Upon completion of the Verification Protocol, the illumipro-10 will display verification test results as either
'Pass' or 'Fail'. In the event that Verification testing does not give acceptable results, the user should
verify the optical path is free of obstructions, the standard is free of visible defects and repeat the
verification testing.
If repeat testing does not give passing verification results, contact Meridian's
Technical Support Staff for further assistance.
NOTE: Each Block of the illumipro-10 functions independently. For example, a failed verification test for
Block A will not prevent use of Block B when Block B verification testing passes.
WARNING: Do NOT leave verification standards in the illumipro-10. Verification Standards will get
hot and could burn the user.
Exposure to temperature may impact the performance of the
Verification Standards.
illumipro-10 Operator's Manual: ENGLISH
Page 14
Copyright© Meridian Bioscience, Inc.
SN11007, REV. 07/2010