Installation
Preparation
Remove all packaging material. While opening the package, water drops may be
seen. This normal phenomenon results from water tests in the factory.
Remove all packaging material including the polystyrene base.
Notice
Dispose of the packaging in an environmentally friendly manner. For information refer-
ring current disposal routes, consult your retailer or the local authorities.
Transport and waiting time
Transport the appliance in horizontal position only. To the maintenance-free lubrication
oil is located in the capsule of the compressor. This oil can get through the closed pipe
system during slanting transport. Before connecting the appliance to the power supply
you have to wait 2 hours so that the oil runs back into the capsule.
52
53
54
WARNING!
If the supply cord is damaged, it must be replaced by the service agent (see warranty
card) in order to avoid a hazard!
28
Aligning the appliance
The appliance should be placed on a flat and solid sur-
face. Set the feet to the desired level (fi g.: 52).
Installation under worktop
1. The dimensions of the recess should at least
agree with the dimensions in the fi gure 53.
2. Put the appliance adjacent to the slot. Make sure
that all connections are easily accessible and func-
tional.
3. Adjust accurately all feet to get a fi rm level posi-
tion.
4. Install the appliance prudently into the recess.
5. Pay attention to suffi cient ventilation.
Electrical connection
Before each connection check if:
power supply, socket and fusing are appropriate
to the rating plate.
the power socket is earthed and no multi-plug
or extension.
the power plug and socket are strictly according.
Only UK: The UK plug meets BS1363A standard
Put the plug into the socket. (fi g.: 54).
EN