Descargar Imprimir esta página

Bang & Olufsen BeoVision 5 - 42 US Manual página 77

Publicidad

6.16
Final check after repair, English
Test and adjustment after replacement of module(s)
XVC
VCX
CXV
R674
SC
R557
TPVAD
R477
Final check after repair
Preparations before adjustment
- Do not connect ESD-mat to PDP.
- Set the PDP and to receive a picture, eg. generate internal picture as dscribed on
page 6.12 Pixel test.
- Checking and adjusting voltage may be performed with a DC-voltmeter
(e.g. multi meter).
Ground is connected to the chassis in the PDP, if nothing else is specifi ed.
Measuring- and adjustment point please refer to illustrations below table.
- Use a non conductive tool for adjustment.
P
Power Supply
SC
Scan Out
SS
Sustain Out
Module
Test Point
P
TPVsus
P
TPVda
SC
TPVbk
SC
TPVad
SS
TPVe
Before reinstalling the PDP in the product run the self-check, page 6.11.
Please continue with "Test and adjustment after repair" and "Final check after
repair", page 5.14 and 5.15.
Value
Tolerance
Lable
± 1V
67 V
± 1V
Lable
± 5V
Lable
± 1V
Lable
± 1V
P
VSUS
VDA
Adjust at
Remark
R621
R646
Fixed value
R6443
R6477
R6774
TPVDA
TPVSUS
R774
TPVE
SS

Publicidad

loading

Productos relacionados para Bang & Olufsen BeoVision 5 - 42 US

Este manual también es adecuado para:

8489