Best CC34E63SB Manual De Instrucciones página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL THE
DUCTWORK
WA R N I N G : To
re d u c e t h e r i s k o f
fire, use only metal
ductwork.
1. Choose the loca-
tion of the hood,
exterior or in-line
blower and any
roof or wall caps,
and decide where
the ductwork will
run. See Fig. 6 and
exterior or in-line
blower instructions
for suggestions.
2. A straight, short
duct run will allow
the hood to perform most effi ciently. Long duct runs, elbows, and transitions will reduce the
performance of the hood. Use as few of them as possible. Larger ducting may be required for
best performance with longer duct runs.
3. Install an exterior or in-line blower.
4. Connect metal ductwork to exterior or in-line blower and work back towards hood location.
Elbows and transitions may be necessary. See exterior or in-line blower instructions for further
information. Use duct tape to seal the joints between ductwork sections.
METAL DUCT
WALL CAP
IN-LINE BLOWER(Shown
ducted through wall/ga-
ble).See in-line blower
instructionsfor specifi c
duct size &ducting
requirements.
- 10 -
ELBOW
EXTERIOR BLOWER
HOOD
48" TO 72" ABOVE COO-
KING SURFACE
10" ROUND METAL DUCT
FIG. 6

Publicidad

Tabla de contenido
loading

Tabla de contenido