Specifications - NAMCO TIME CRISIS 2 Manual Del Operador

Tabla de contenido

Publicidad

1. SPECIFICATIONS

POWER SUPPLY:-
AMBIENT OPERATING
TEMPERATURE:
MONITOR:-
COIN ACCEPTOR:-
DIMENSIONS:-
WEIGHT:-
ACCESSORIES:-
Assembled
Monitor Cabinet
Coin Tower
Header Assembly
Pedal Assembly
Assembled
Monitor Cabinet
Coin Tower
Header Assembly
Pedal Assembly
230volts / 220watts AC
+5°C to +25°C
Hantarex 28" Polo (Auto Degauss)
Mars CashFlow - 1 Channel
765(w) x 1510(d) x 2090(h)
765(w) x
790(d) x 1730(h)
260(w) x
720(d) x 1110(h)
720(w) x
380(d) x
250(w) x
250(d) x
166kg
111kg
35kg
16kg
4kg
Keys:
(Cash Door) .................... 2
(Coin Door) ..................... 2
(Back Door) .................... 2ea
IEC Mains Lead ............................ 1
Operators Manual ......................... 1
Monitor Manual ............................. 1
CashFlow Documents .................. 1
Pedal Assy ..................................... 1
Pozi Pan Head Screw (M6x30) ... 2
Flat Washer (M6) .......................... 2
Spring Washer (M6) ..................... 2
Hex Head Screw (M8x25) ............ 4
Flat Washer (M8) .......................... 4
Spring Washer (M8) ..................... 4
M5 Security Wrench ..................... 1
M6 Security Wrench ..................... 1
Page 29
480(h)
160(h)

Publicidad

Tabla de contenido
loading

Tabla de contenido