VERTICAZL/TOWER INSTALLATION
Step 1: Attach Dust Covers
Insert Dust Covers into the Rackmount Ear screw holes that are not being used.
Step 2: Attach the base stands
Simply slide the base stands onto the bottom of the UPS, roughly 8-10" apart.
Step 3: Rotate the Multifunction LCD Readout
Insert a small straight-slot screwdriver into
the notch and gently lift the LCD out.
Switch back and forth lifting one side then
the other to gently work it out far enough
that you can grasp it with your fingers and
pull it out.
Push it back in with
your fingers.
7
HARDWARE INSTALLATION
Rotate it to the
preferred orientation.
Copyright © 2015 CyberPower Systems, Inc.
The LCD is out.