UNPACKING
Pull lid latches in an outward motion and remove tank
cover. Remove any accessories and literature that may
have been packed in the vacuum tank.
ASSEMBLY
DOLLY SYSTEM
ASSEMBLY
You will find two casters FIGURE 1, two large rear
wheels FIGURE 2, one axle FIGURE 3, tool rack
FIGURE 4, two cap nuts FIGURE 5, and one screw
pack (containing four screws, two flat washers) with
your wet/dry vacuum. Assemble as follows:
FIGURE 1
FIGURE 2
FIGURE 4
FIGURE 5
1. Make sure the cord is disconnected from the
receptacle then remove the tank cover.
2. Turn tank upside down so bottom is facing up.
3. Place axle upright on a hard
surface and hammer on one cap nut.
FIGURE 6.
FIGURE 6
4. Place one wheel on axle and slide
down to cap nut. FIGURE 7. Be
sure flat side of wheel hub is facing
outward.
FIGURE 7
5. Slide axle through holes provided
in tool rack. FIGURE 8.
FIGURE 8
FIGURE 3
6. Slide remaining wheel onto axle
and hammer on second cap nut.
FIGURE 9.
FIGURE 9
7. Install tool rack assembly onto
dolly (already installed on tank) by
placing large slot in tool rack over
rim on back of dolly. FIGURE 10.
Push tool rack onto dolly until the
bottom of tool rack is flush with
FIGURE 10
bottom of dolly. NOTE: It is normal
for tool rack to fit tightly onto dolly.
FIGURE 11
9. Place one flat washer over stem of each caster.
10. Insert casters into front of dolly
by placing stem of casters into
holes provided. Apply pressure and
twisting motion until casters snap
into place. FIGURE 12. Return
tank to upright position.
FIGURE 12
CARRIAGE HANDLE
ASSEMBLY
You will find one carriage handle FIGURE 13 and a
handle pack containing two side tank handles
FIGURE 14, four handle supports FIGURE 15 and
eight screws. Assemble as follows:
FIGURE 13
FIGURE 14
11. Take two handle supports and
two 1" screws. Place screws through
the hole provided in center of each
support. FIGURE 16.
FIGURE 16
8. Secure with four
screws provided in the
screw pack.
FIGURE 11.
FIGURE 15
PAGE 5