6.
Install a 1in.×3/4in.PVC Male Adapter to the
galvanized tee. (Fig. 6)
8.
Remove the 1/8" NPT pipe plug from the pump Air
Volume Control (AVC) port. Near the top tapping of
the pump face, thread a 1/8 in barbed barb x MIP
adapter fitting into the pump's AVC port. Run tubing
from the pump's AVC port to the port on the AVC
mounted on the tank. You have just completed the
tank connection for your shallow well jet pump. (Fig.
8)
NOTE: As the pump refills the tank with water, the
air volume control supplies the tank with the correct
air to water ratio for the system to operate. If the air
volume control is good, the pump will shut off at the
desired cut-off setting and will be adjusted correctly.
PUMP ELECTRICAL CONNECTIONS
WARNING: Risk of electric shock. Can shock, burn or kill. Disconnect
power before working on pump, motor, pressure switch, or wiring.
To change from 230V to 115V
The motor is 115/230 Volt single phase and pre-wired at 230 volts.
If the power supply is 115 volts, remove the rear cover of motor.
Slide the switch to show 115 Volt.
Replace the rear cover of motor.
WARNING: Risk of electric shock. Can shock, burn or kill. Be sure power is
off. Never connect a motor set to 115 V to a 230 V power supply.
For Professional Technical Support call 1-844-242-2475
7.
Install a short 3/4in.PVC rigid Pipe,Then
completed installation with piping and tank is shown
(Fig. 7)
9