Toto CST243 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4) Place the tank upside down onto some padding. Inspect the
connection (see Illustration 4). Try to tighten the nuts with
your hands. If loose, tighten the nut hand tight and an
additional 1/2 turn for the larger flush valve nut.
5) Place the tank-to-bowl gasket onto the flush valve nut.
While pressing down, spread the gasket over the nut
until the gasket touches the bottom of the tank. A
slight gap between the tank bottom and the gasket is
allowable.
6) Lay the tank down on its back. Place a rubber washer
onto a brass bolt (see Illustration 5). Reach inside the
tank and position the bolt through one of the holes in
the bottom of the tank. On the outside of the tank,
place a metal washer and nut onto the bolt. Hold the
bolt centered in the hole and tighten the nut finger
tight. Turn the nut an additional 1/2 turn with a wrench.
Repeat this process for the remaining hole in the tank.
7) Pick up the tank and carefully guide the brass
bolts to align the tank with the bowl.
8) Attach a metal washer and nut to each bolt.
tank is level (see Illustration 6). Once level, tighten
the bolts equally until the tank makes THREE
POINTS OF CONTACT with the bowl.
9) Flush the water supply line for a few seconds to
valve. (For new home constructions and/or
additions, flush the water supply line for more
than a minute to help remove any residual PVC
adhesives, solder flux, and/ or pipe sealants that
were used for the new plumbing.)
10) Connect the water supply line to the fill valve threads
as seen at the bottom of toilet tank (see Illustration 7).
Tighten this connection finger tight.
CAUTION: Avoid using a wrench to tighten the connec-
tion as you may damage the plastic threads and/or cause
INSTALLATION PROCEDURE
Ill. 5
Cut Away View
Points of Contac t
1
Ill. 6
NO
3 Gap
Ill. 7
4
Ill. 4
Flush
Fill
Valve Nut
Valve Nut
Tank-to-Bowl
Gasket
Metal Washer
Rubber Washer
Rubber Washer
Nut
Bolt
3
YES
3
1 & 2
NO
1 & 2
1 & 2
3
7/8" Ballcock Thread
HAND TIGHTEN ONLY
2
Gap

Publicidad

Tabla de contenido
loading

Tabla de contenido