Descargar Imprimir esta página

Installation; Boiler Room - Sime AQUA HE 25 ErP BE Instrucciones Para El Instalador

Publicidad

Idiomas disponibles

Idiomas disponibles

2

INSTALLATION

2.1

BOILER ROOM

The. boilers. with. a. rating. of. more.
than. 35. kW. must. be. equipped. with.
a.technical.room.whose.dimensions.
and.requirements.correspond.to.the.
current.standards.and.regulations..
The.minimum.distance.between.the.
walls. of. the. room. and. the. boiler.
must.not.be.less.than.0.60.m.,.while.
the. minimum. height. between. the.
AQUA HE 25-35 ErP BE
top. of. the. boiler. and. the. ceiling.
must. be. at.least. 1. m..which. can. be.
reduced. to. 0.50. m.. for. boilers. with.
incorporated. heaters. (however. the.
minimum. height. of. the. boiler. room.
must.not.be.less.than.2,5.m)..
The.boilers.with.a.rating.of.less.than.
35. kW. can. be. installed. only. in. per-
fectly.air-vented.rooms..
To.circulate.air.in.the.room,.air.vents.
must. be. made. on. the. outside. walls.
2
bar
1
3
0
4
OPEN
which. satisfy. the. following. require-
ments:
–..Have. a. total. surface. area. of. at.
least.6.cm
of. thermal. capacity. and. however.
not.less.than.100.cm
–..To.be.situated.as.close.as.possible.
to. the. floor,. unobstructable. and.
protected. by. a. grate. which. does.
AQUA HE 25-35 INOX ErP BE
2
.for.each.installed.Kw.
2
.
2
bar
1
3
0
4
Fig..4
75

Publicidad

loading

Este manual también es adecuado para:

Aqua he 35 erp beAqua he 25 inox erpAqua he be 35 inox erp be