3.
PREPARING THE MOWER FOR OPERATION
3.1 UNPACKING AND INSPECTING THE CONTENTS
This chapter primarily serves the needs of the vendor's mechanics that prepare the mower
for the user within the scope of pre-sale service. In the event that you have received your
mower already assembled and ready for operation, please skip directly to chapter 4.
In the event that you have unpacked the mower yourself, then it is necessary to prepare it
for operation according to the instructions contained in this chapter. In the event that you
are unsure about the procedure or you have insufficient equipment, tools or experience,
please do not hesitate to contact the vendor of the mower for assistance.
We recommend performing all assembly works in a team of at least two people.
Inspect immediately after delivery that the packed mower has not been damaged. In the
event of damage inform the carrier. If the complaint is not lodged in time, no potential
demands can be claimed.
Check that the mower model is the same as you ordered. In the event of an irregularity do
not unpack the mower and immediately report this discrepancy to the supplier.
1. Crate packaging
2. Seat
3. Folding frame
3.1
4. Steering wheel
5. Documentation (located underneath the hood)
Using a suitable tool (e.g. crowbar or hammer, etc.) remove the crate (1) and the packaging on the
mower.
Visually inspect the mower and assemblies for damage that may have occurred during transport. Unpack
all separately packed assemblies and inspect them.
The basic package includes:
} Riding mower
} Seat (2)
} Folding frame in the folded state (3)
} Steering wheel (4)
} Documentation (5) (packed parts list, user's manual for the riding mower, user's manual for the
engine, user's manual for the battery, service log book)
3.2 DISPOSAL OF THE PACKAGING
After unpacking the accessories, ensure that the packaging material is properly disposed
of or recycled. The disposal must conform to relevant waste disposal laws valid in the
user's country.
Disposal may be performed by a specialised company.
3.3 ASSEMBLY OF THE SEPARATELY PACKED ASSEMBLIES
Due to the technical nature of this task, the mower is prepared for operation by the vendor
of your riding mower (according to the following instructions).
Before starting installation, remove all covering, protective and fastening materials.
20