Step 17: (fig. 17)
1. Place the grate (AD) in the bottom of the hopper and
attach the cover (AJ) over the top.
Fig. 17
AJ
AD
DefLeCtOr
• Assemble and attach the included deflector for
applications that require a narrower spread pattern
such as spreading product on sidewalks or around
landscaping edges. Follow the steps below.
1. Attach the plastic clips (W) to the Deflector (AC) using a
slot bolt (V) and SEMS hex nut (T).
Fig. 18
T
2. Attach the Deflector (AC) as shown in Fig 19.
Fig. 19
AC
OPerAtiOn
CAlIbRATE ThE Flow CoNTRol SETTINg
W
1. Move the control lever (A) to the "OFF" position.
2. Slide the control bracket along the control tube until the
V
3. Lightly tighten the hex nuts that fasten the flow control
4. Set the adjustable stop (B) at "5". Pull the control lever (A)
5. If the shut-off plate does not open half way, adjust the
6. Tighten the hex nuts.
AC
B
A
shut-off plate in the bottom of the hopper is closed.
bracket to the control tube.
against the stop (B) and verify that the shut-off plate has
opened about half way.
position of the control bracket until the shut-off plate
opens about half way and closes completely.
ENglISh
7