Descargar Imprimir esta página

Before First Use - PYD Electrobombas KS Serie Manual De Instalación Y Mantenimiento

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION AND MAINTENANCE MANUAL
BILGE PUMP KS

3. BEFORE FIRST USE

Carry out the following checks on receipt of the pump.
1) Check that the pump has not been damaged in transit.
2) Inspect the pump for breaks, bumps, damaged threads, etc.
3) Check the cable for cuts or other damage.
4) Check and tighten any parts that appear loose.
5) Carefully read the labels, stickers and markings on the pump.
6) Important: Always check that the data on the pump nameplate (model, power, ampera-
ge, voltage) match those on the electrical panel and supply.
7) Use a meter to check the resistance between the winding wires and ground (green) to
verify the insulation resistance of the motor. For reference, the minimum resistance value
should be 20MΩ.
The warranty does not cover damage caused by connecting the pump to an incorrect
power source (voltage/phase). Record the models and serial numbers of the pump and
electrical panel at the front of this instruction booklet for future reference. Give it to the
owner or attach it to the electrical panel when installation is complete.
4. INSTALLATION OF THE PUMP
1) The pump is designed for use with water or water-based solutions. Please contact
the manufacturer for additional information.
2) Risk of electrical damage. The pump is supplied without a plug. To reduce the risk of
electrical hazard, ensure that it is properly grounded.
3) Use a lifting rope or chain (not included) to the handle or lifting rings on top of the
pump.
www.proindecsa.com / proindecsa@proindecsa.com
11
ENG

Publicidad

loading