4 Connect the connector housing and the plug. To
do this, push the outer ring of the plug toward
the connector housing. Tightening torque:
1-2 Nm.
5 Tighten the cable gland.
Tightening torque for cable sheath diameters
between 13 and 20 mm: 6 to 8 Nm.
Ensure that strain relief is provided as required.
BG
CS
DE
EL
EN
ES
FR
IT
NL
PT
SL
50

5 Commissioning

CAUTION
Ensure proper mechanical and electrical installation
before commissioning the Solar Inverter.
Check the cables to ensure that they are in sound
condition.
Always disconnect the mains connection first by
switching off the corresponding mains fuse and
before disconnecting the solar generator side by
opening the DC load break switch.
The Tyco Solarlok connectors on the solar generator
side must not be disconnected under load. First turn
the DC load break switch to position 0.
Connecting
1 Establish the grid connection via the external
circuit breaker.
2 Switch on the solar generator voltage by closing
the DC load break switch (switch position 1). The
Solar Inverter starts operating when the input
voltage level is adequate.
Disconnecting
1 Interrupt the grid connection by switching off
the circuit breaker.
2 Disconnect the solar generator side by opening
the DC load break switch.
Commissioning menu
The commissioning menu comes up automatically
when the Solar Inverter is connected for the first
time. Use the arrow keys and the OK button for
navigation.