Descargar Imprimir esta página

Waeco ASC 6300 G LE Instrucciones De Uso página 26

Ocultar thumbs Ver también para ASC 6300 G LE:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN
13.8.3
Filling process
1. Enter the preferred settings and press
Filling phase?
ENTER-OK STOP-EXIT
2. If Filling phase has been selected, enter the required value, otherwise continue with chapter
nections
on page 26.
3. Enter the amount of refrigerant oil which was previously drained or which is required.
4. Press the cursor key
5. Enter the additive quantity.
6. Press the cursor key
7. Enter the refrigerant quantity.
8. Press
ENTER
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Note
• If extraction is taking place in the same process sequence, the quantity of fresh oil is counted as an
additional filling quantity, and is added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled again.
• To add fresh oil or UV additive, a vacuum process must be performed in the same process se-
quence. If no vacuum process has been selected, only refrigerant can be selected in the filling
menu.
13.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system connections:
• Air conditioning system has a high pressure and a low pressure connection: Select LP/HP.
• Air conditioning system only has a high pressure connection: Select HP.
• Air conditioning system only has a low pressure connection: Select LP.
2. Press
ENTER
HP/LP
HP
LP
ENTER-OK STOP-EXIT
3. Once all settings have been entered, press
Process start?
ENTER-OK STOP-EXIT
13.8.5
After ending the air conditioning service
After the air conditioning service has finished, you are prompted to disconnect the hoses of the A/C service unit
from the vehicle air conditioning system.
1. Disconnect the service hoses and press
The service hoses will now be drained. the A/C service unit is then ready for further use.
2. Screw the valve caps of the air conditioning system back on the connections.
26
ENTER
.
.
to confirm all settings.
ml.
ml.
g.
to confirm.
PORT
PORT
PORT
ENTER
to confirm.
Yes
No
0
7
500
ENTER
to start the process.
to confirm.
 
Selecting con-

Publicidad

loading

Este manual también es adecuado para:

Asc 6400 g leAsc 6300 gAsc 6400 g91033031079103303108