Descargar Imprimir esta página

Solplanet ASW LT Serie Manual Del Usuario página 4

Ocultar thumbs Ver también para ASW LT Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
IV. Inverter Mounting
1. Use a Φ10mm bit to drill 3 holes at a depth of about 70mm according to the location of the wall
mounting bracket. (Figure A)
2. Insert three wall plugs into the wall and fix the mounting bracket to the wall by inserting three
Screws (SW10). (Figure B)
3. Hang the slot on the back of the inverter to the hook on the top of the mounting bracket. (Figure C)
4. Secure the inverter to the mounting bracket on both sides using two M5 screws. Screwdrivert
ype:PH2, torque:2.5Nm. (Figure D)
(Figure A)
(Figure C)
V. AC connection
All electrical installations must be done in accordance with all local and national rules.
Ensure that all DC switches and AC circuit breakers have been disconnected and all power
sources have been electrically isolated before any electrical terminations have been made. High
voltages produced by the inverter may lead to electrical shock.
In accordance with safety regulations, the inverter needs be correctly grounded. When a poor
ground connection (PE) occurs, the inverter will report PE grounding error. Please check and
ensure that the inverter is grounded firmly or contact AISWEI service.
1. Strip the AC cable as shown in the figure , and crimp the copper wire to the appropriate OT
terminal (according to DIN 46228-4, provided by the customer).
2
Object Description
A
External diameter
B
Copper conductor cross-section
C
Stripping length of the insulated conductors
D
Stripping length of the cable outer sheath
Note: the PE conductor is at least 5mm longer than the L and N
(Figure B)
(Figure D)
conductors.
Value
18-21mm
4-16mm
2
12mm
75mm

Publicidad

loading