Diagram E (Apportioned volume process) - Should
the components be moved, typically from a magazine,
with discharge in metered volume, this mode of opera-
tion is used. The volume is determined by a certain
number of discharges in combination with the level in
the CVL. After discharging, the process is repeated until
the set number of discharges (volume) is reached, after
which the CVL remains open, until the Reset switch has
been activated. The discharge process continues again
until the desired volume is reached once more.
This operating mode can be equipped with start / stop
contact, whereby the CVL can be stopped when eg. the
magazine is empty. Additionally, this mode of operation
shall be equipped with a reset switch, that can be acti-
vated by replacing eg. cardboard boxes under the CVL
Prerequisites:
Program 3 is selected
Any start / stop contact is connected to terminals 9
and 10, or a loop mounted between terminals 9 and
10
The reset contact is connected to terminals 11 and
12
Terminals 13, 14 and 23 are connected to the level
sensor
Please note that N and E_N is set in the control, see
"Operating the control".
NB - The MultiAir FC 2000 blower series is prepared for
the start / stop signal from the CVL control.
Program 4:
Program 4 is used in connection with the CPU system,
and contains the necessary communication to work
with the CPU.
It is optional if the blower is to be started and stopped
by the control unit, or the blower must run constantly.
Operating the control unit:
Stop, Program1,
Program 2
T1, T2, T3, T4, N
8
Arrow keys
Selecting time-control and changing values (Pro-
gram 1):
1. The control is stopped at the Start / Stop switch
2. Press ESC for 3 seconds, whereafter a blinking
3. Highlight the line Program with the vertical arrow
4. Press OK
5. Press the horizontal arrow keys, so the cursor is on
ESC
OK
6. Confirm by pressing OK
Para-
Description
meter
STOP / Program 1 / Program 2
Program
(STOP is shown when the start/
Stop switch is on Stop)
Total cycle time (filling time +
T1
discharge time)
Bottom valve opening time
T2
(discharge time)
Time delay between incom-
ing signal from eg. an injection
moulding machine until the bot-
T3
tom valve opens.
NB - The CVL will not draw com-
ponents when the bottom valve
is open
The time in which any blow back
valve operates. Should be set to
500 ms (it is the pressure shock,
T4
that ensures, that the compo-
nents falls down into the CVL
chamber)
Number of signals to come from
eg. the injection moulding ma-
chine before the bottom valve
opens. If the CVL bottom valve
N
should open every time a signal
from the injection moulding ma-
chine is received, the counter N
must be set to 1
Number of discharges the CVL
must make before the reset but-
E_N
ton should be pressed (only used
at Measured volume process /
diagram E / program 3)
Number of movements the bot-
tom cone of the CVL makes, to
Shakes
shake any hanging components
loose
curson will appear
keys
the value to the right, and press the vertical arrow
keys to change the value to 1
Unit/
value
STOP
Prgm
1
Prgm
2
mS
mS
mS
mS
No
No
No