Descargar Imprimir esta página

NDS Zerowire G2 Instrucciones página 15

Ocultar thumbs Ver también para Zerowire G2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

B
A
en
Installation back view – mounting screws
With the mounting blade facing the front of the display, slide the step bracket between
the VESA mount and the back of the display until notches labeled for the display you
are working with fit over the two left-hand screws. See C in graphic Installation back
view – step bracket and modules [} 16].
Replace the right-hand screws with the provided screws.
Tighten all screws.
Set up and Installation
| 15

Publicidad

loading